ANALISIS PENJADWALAN PROYEK (NETWORK) PENATAAN KAMPUNG DERET RT 006 / RW 013 KELUARAHAN TUGU UTARA KECAMATAN KOJA JAKARTA UTARA

Lukiyana , Ari Soeti Yani

Abstract


Scheduling is a part of planning a project is planning of the time for doing the job. Project is a combination of activity that interrelated and must be finished by following an order before all of it can be finished completely. That is why a schedule for finish all work that needed for a project must be made. Scheduling can be done with a few way including the CPM (Critical Path Method).
With using the CPM, doing house renovation via penataan kampung deret in RT 006 / RW 013 kelurahan Tugu Utara kecamatan Koja is searching it‟s critical way. From it‟s critical way will be obtained a very efficient time and done optimaly.
Scheduling home renovation project via penataan kampung deret that will be done by RT 006 / RW 013 residents with building consultan PT. Indosela Pratama produced 155 days of completion time for resident that have 36 m2 of land area, whereas 85 days of completion time for residents that have less than 36 m2 of land area, both are done with 4 handymans and 3 kenek. From 25 KK that have 36 m2 of land area are as much as 21 KK, and the rest of it are 4 KK have only less than 36 m2 of land area.
In order to make scheduling time of penataan kampung darat RT 006 / RW 013goes well then need a collaboration between the local residents, agencies, tribal agencies and consultan side.
Keywords: Project scheduling, penataan kamung deret, CPM.