Successful E-Procurement Implementation: A Case Study in a Construction Industry Company

Kusuma Yudha Ramadhani, Wiwiek Rabiatul Adawiyah, Weni Novandari

Abstract


This study aims to determine the factors that influence of satisfaction and implementation of e-procurement users in construction industry company. The sample of this study was selected based on the purposive sampling method by selecting samples by seen the criteria of tbhe e-procurement system that had been applied in construction industry companies. The method analysis used in this study was Structural Equation Models (SEM) with Partial Least Square (PLS) approach. The results show that the factors that influence user satisfaction and the implementation of e-procurement are the quality of information and perceptions in terms of benefits. The quality of the system affects to the implementation of e-procurement, while the perception of user convenience does not give a significant affect user towards satisfaction and the implementation of e-procurement.

Keywords: Implementatio; E-Procurement; User Satisfaction


Full Text:

PDF

References


Alamanda, C. (2015). Pengaruh Persepsi Kemudahan Penggunaan Terhadap Intensi Perilaku Melalui Persepsi Manfaat Dan Sikap Pada Sistem Informasi E-Banking. STIE Perbanas Surabaya.

Angeles, R. (2005). RFID technologies: supply-chain applications and implementation issues. Information Systems Management, 22(1), 51–65.

Beldad, A., van der Geest, T., de Jong, M., & Steehouder, M. (2012). A cue or two and I’ll trust you: Determinants of trust in government organizations in terms of their processing and usage of citizens’ personal information disclosed online. Government Information Quarterly, 29(1), 41–49.

Carayannis, E. G., & Popescu, D. (2005). Profiling a methodology for economic growth and convergence: learning from the EU e-procurement experience for central and eastern European countries. Technovation, 25(1), 1–14. https://doi.org/https://doi.org/10.1016/S0166-4972(03)00071-3

Davila, A., Gupta, M., & Palmer, R. (2003). Moving procurement systems to the internet:: The adoption and use of e-procurement technology models. European Management Journal, 21(1), 11–23.

Dooley, K., & Purchase, S. (2006). Factors influencing e-procurement usage. Journal of Public Procurement.

Gunasekaran, A., McGaughey, R. E., Ngai, E. W. T., & Rai, B. K. (2009). E-Procurement adoption in the Southcoast SMEs. International Journal of Production Economics, 122(1), 161–175.

Hasugian, H. (2016). Kajian Penerapan E-Procurement Industri Konstruksi: Studi Kasus Pada PT. Rekayasa Industri. Telematika MKOM, 2(2), 116–125.

Lennon, C. (2002). Achieving bottom line results in a flat economy: leveraging procurement business services. Computer Sciences Corporation, El Segundo, CA.

Lowe, D. J., & Parvar, J. (2004). A logistic regression approach to modelling the contractor’s decision to bid. Construction Management and Economics, 22(6), 643–653. https://doi.org/10.1080/01446190310001649056

Pearcy, D. H., & Giunipero, L. C. (2008). Using e‐procurement applications to achieve integration: what role does firm size play? Supply Chain Management: An International Journal.

Puschmann, T., & Alt, R. (2005). Successful use of e‐procurement in supply chains. Supply Chain Management: An International Journal.

Sompotan, R. M. R., Mandey, S. L., & Saerang, I. S. (2021). Pengaruh Kualitas Informasi, Kualitas Sistem Dan Regulasi Pemerintah Terhadap Implementasi E-Procurement Pada Kantor Dinas Pekerjaan Umum Kota Bitung. Aksara: Jurnal Ilmu Pendidikan Nonformal, 7(2), 605–618.


Refbacks

  • There are currently no refbacks.